
Metal Fabrication
From 60-minute quotes to under 5 minutes — with zero errors.
How a metal fabrication shop eliminated their quoting bottleneck and tripled daily output.
The Problem
Quoting took 30–60 minutes per job using pen, paper, and phone screenshots. Material calculations were done by hand, leading to costly errors. The owner was the only person who could produce accurate quotes — if he was unavailable, the business stopped.
Quoting took 30–60 minutes per job using pen, paper, and phone screenshots
Material calculations done by hand led to costly pricing errors
Only the owner could produce accurate quotes — creating a single point of failure
When the owner was unavailable, the quoting process stopped entirely
What We Built
A custom quoting and job management system that auto-calculates material costs, generates professional quotes in under 5 minutes, and allows any trained team member to produce accurate estimates. Integrated with their existing supplier pricing and shop floor workflows.
Instant Quoting Engine
Auto-calculates material costs based on dimensions, material type, and current supplier pricing. Generates professional PDF quotes in under 5 minutes — down from 30–60.
Instant Quoting Engine
The Results
<5 min
Quoting time (was 30–60 min)
0
Material miscalculations since launch
3x
More quotes per day
The owner is no longer the bottleneck. Multiple team members now produce accurate quotes in minutes, not hours. Material pricing errors — which used to cost thousands per quarter — dropped to zero. The shop processes three times as many quotes per day, directly increasing revenue capacity.
“We went from spending an hour on every quote to under five minutes. The system paid for itself in the first month.”
Want results like these for your business?
Free 30-min call · No pitch · Just a conversation
How We Got Here
Week 1–2
Discovery
Sat with the owner through a full quoting cycle. Documented every material lookup, calculation, and pricing decision.
Week 3–5
Build
Built the quoting engine with supplier pricing integration and material calculator. Tested against 50 historical quotes for accuracy.
Week 6–7
Launch
Rolled out to the team with hands-on training. Ran parallel quoting (old vs. new) for one week to validate.
Ongoing
Optimize
Supplier pricing updates automatically. New material types added as the business takes on new project categories.
Week 1–2
Discovery
Sat with the owner through a full quoting cycle. Documented every material lookup, calculation, and pricing decision.
Week 3–5
Build
Built the quoting engine with supplier pricing integration and material calculator. Tested against 50 historical quotes for accuracy.
Week 6–7
Launch
Rolled out to the team with hands-on training. Ran parallel quoting (old vs. new) for one week to validate.
Ongoing
Optimize
Supplier pricing updates automatically. New material types added as the business takes on new project categories.
Ready to get results like Meridian Shield?
Every business on this page started with the same 30-minute call. No pitch. No pressure. Just a conversation about what's possible.
Free 30-min call · No obligation · We'll show you what's possible